• Client: MR.MOHAMED THANI MURSHED GHANAM AL RUMAITHI
  • Consultant: HEBERGER ENGINEERING CONSULTANCY
  • Contractor: SS LOTAH GENERAL CONTRACTING
  • Main Contractor: TBA

Scope

  • FIRE PUMP
  • FIRE HYDRANT
  • FIRE FIGHTING
  • FIRE SPRINKLER SYSTEM
  • FM200 SYSTEM
  • FOAM SYSTEM